Pressroom

Welcome to the Press Centre of ATP architects engineers. Here you can find and download current press information and other basic information about our company.

.jpg

2480 x 1863

824.24 KB

.JPG

3264 x 2448

1.78 MB

.jpg

3936 x 2852

2.46 MB

.jpg

2000 x 1250

501.73 KB

.jpg

4404 x 2964

1.28 MB

.jpg

1535 x 2317

761.74 KB

.jpg

2126 x 1406

402.26 KB

.jpg

3543 x 2362

1.3 MB

.jpg

1417 x 944

390.79 KB

.JPG

3264 x 2448

1.42 MB

.jpg

2126 x 1406

322.52 KB

.jpg

2126 x 1406

406.55 KB

.jpg

2126 x 1406

573.72 KB

.jpg

3508 x 2635

1.33 MB

.jpg

2126 x 1406

440.68 KB

.jpg

2500 x 1200

431.77 KB

.jpg

2126 x 1406

402.26 KB

.jpg

2126 x 1406

440.68 KB

.jpg

2126 x 1406

573.72 KB

.jpg

2480 x 1653

1.34 MB

.jpg

3780 x 2520

2.09 MB

.jpg

1024 x 640

84.15 KB

.jpg

2480 x 1653

1.28 MB

.jpg

3150 x 3780

2.64 MB

.jpg

2480 x 1654

452.07 KB

.jpg

4000 x 4000

5.01 MB

.jpg

2240 x 1600

612.95 KB

.txt

.jpg

3723 x 2484

1.1 MB

.txt

.jpg

3780 x 2520

749.78 KB

.txt

.jpg

2362 x 1575

1.81 MB

.jpg

2362 x 1575

1.06 MB

.jpg

2362 x 1575

989.86 KB

.jpg

2362 x 1575

738.17 KB

.jpg

2362 x 1575

834.12 KB

.jpg

2362 x 1575

735.56 KB

.jpg

2000 x 1333

337.69 KB

.txt

.jpg

3780 x 2523

2.25 MB

.jpg

2400 x 1800

937.22 KB

.jpg

4800 x 3600

3.05 MB

.jpg

4800 x 3595

6.11 MB

.jpg

2480 x 1654

452.07 KB

.txt

.jpg

2480 x 1353

1.19 MB

.jpg

2480 x 1347

1.24 MB

.jpg

2480 x 1350

1.13 MB

.jpg

9831 x 2235

1.96 MB

.jpg

1600 x 1120

174.98 KB

.txt

.jpg

3543 x 2680

1.28 MB

.jpg

3543 x 2662

1.04 MB

.jpg

3543 x 2362

1.07 MB

.jpg

3543 x 2362

1.42 MB

.jpg

3543 x 2362

1.51 MB

.txt

.jpg

2374 x 3508

1.14 MB

.jpg

2480 x 1863

712.73 KB

.txt

.jpg

2480 x 1653

1.43 MB

.jpg

2480 x 1653

1.34 MB

.jpg

2480 x 1653

1.28 MB

.jpg

2480 x 1853

1.12 MB

.jpg

2480 x 1538

1.1 MB

.txt

.jpg

4000 x 4000

4.11 MB

.jpg

4000 x 4000

5.01 MB

.jpg

4000 x 4000

3.24 MB

.jpg

2045 x 1251

262.62 KB

.txt

.txt

.txt

.jpg

3543 x 2362

973.3 KB

.txt

.jpg

3780 x 2520

1.34 MB

.txt

.jpg

2480 x 1654

1.11 MB

.jpg

2480 x 1654

1.41 MB

.jpg

2480 x 2153

848.53 KB

.jpg

2480 x 1653

1.24 MB

.jpg

2480 x 1654

1.06 MB

.jpg

2480 x 1654

885.4 KB

.txt

.jpg

3543 x 2367

1.23 MB

.jpg

2480 x 1569

619.9 KB

.jpg

3543 x 2367

1.47 MB

.txt

.jpg

2550 x 1366

853.54 KB

.jpg

2000 x 1071

705.36 KB

.jpg

1822 x 976

387.88 KB

.jpg

2000 x 1333

430.35 KB

.jpg

2000 x 1333

389.57 KB

.jpg

2000 x 1333

389.42 KB

.jpg

2000 x 1333

373.08 KB

.jpg

1333 x 2000

395.06 KB

.jpg

1333 x 2000

379.95 KB

.jpg

2000 x 1333

508.92 KB

.jpg

2000 x 1333

288.63 KB

.jpg

2000 x 1333

398.45 KB

.jpg

2000 x 1333

323.49 KB

.jpg

2000 x 1333

353.57 KB

.jpg

2000 x 1333

322.66 KB

.jpg

2000 x 1333

495.83 KB

.jpg

2530 x 1295

829.84 KB

.txt

.jpg

2480 x 2480

1.77 MB

.jpg

2480 x 2480

1.57 MB

.txt

.jpg

2480 x 1395

1.36 MB

.jpg

2480 x 1395

1.43 MB

.txt

.jpg

3780 x 2520

2.91 MB

.jpg

3780 x 2518

3.61 MB

.jpg

3780 x 2520

2.6 MB

.jpg

3780 x 2518

3.61 MB

.jpg

3780 x 2520

3.79 MB

.jpg

3780 x 2518

3.39 MB

.jpg

3780 x 2520

2.17 MB

.jpg

3780 x 2520

1.78 MB

.jpg

3780 x 2520

2.55 MB

.jpg

3780 x 2520

2.61 MB

.jpg

3780 x 2520

2.46 MB

.txt

.jpg

3780 x 2520

2.09 MB

.jpg

3780 x 2836

2.54 MB

.jpg

3780 x 2878

2.82 MB

.jpg

3780 x 3802

2.97 MB

.jpg

3780 x 2428

975.29 KB

.jpg

2902 x 2177

1.14 MB

.jpg

3780 x 2836

2.4 MB

.jpg

2841 x 2131

1.79 MB

.txt

.jpg

2480 x 1736

686.75 KB

.txt

.jpg

3543 x 2362

1.56 MB

.jpg

3543 x 2362

1.42 MB

.jpg

3543 x 2332

1.27 MB

.jpg

3543 x 2362

1.61 MB

.jpg

2480 x 1736

688.75 KB

.txt

.txt

.txt

.jpg

3307 x 2480

2.53 MB

.jpg

3307 x 2480

3.23 MB

.jpg

3780 x 2520

2.05 MB

.jpg

3780 x 2520

1.55 MB

.jpg

560 x 150

27.11 KB

.txt

Agree with the terms and conditions

All contents of this message as .zip:

08.11.2024

Hybrid Timber Office Building

Grand Central, Vienna

This press release includes:

Press Release  (3700 character)

The “Grand Central” office building at Vienna’s Floridsdorf Station is a hybrid timber building par excellence, because the building complex had to be built as quickly as possible, due to its extremely busy location. In addition to this, this environmentally-friendly building method was also a game changer in terms of the key structural requirement – that the building had to be as light as possible due to the fact that it is supported by the metro tunnel that passes below it. The elegant role played by the (completely invisible) use of timber in the integrated design of the building with Building Information Modeling (BIM) comes as a particularly pleasant surprise.

Functionally flexible, light, and rapidly realized
The objective of the “Grand Central” building complex at the Vienna Floridsdorf transport hub is to exploit the potential of the booming region to the north of the Danube and to provide urgently needed rental office space. The designers were required to conceive a new building that offers maximum flexibility in the use of the spaces so that it can meet the needs of a wide range of tenants. The hybrid timber building method facilitates a particularly flexible division of the spaces – from open plan to cellular offices. The six-story new building consists of two elements with a total of 12,000 m2 of office space.

Resource-friendly and energy-efficient building method
ATP architects engineers planned the building complex using the ecologically sustainable hybrid timber building method, which enabled the ecological footprint to be massively reduced. In addition to this, the new building was built above the existing structure of the metro and a former car park, as a result of which no green space disappeared under concrete. A PV plant supplies the building with its own electricity. ATP sustain, the research and specialist design company for sustainable designing and building, accompanied the design process in order to obtain building certification in line with the klimaaktiv standard of the Federal Ministry for Climate Action, Environment, Energy, Mobility, Innovation and Technology (BMK). The aim is to achieve Gold or Silver certification.

Special vibration and noise protection
As the building complex at Floridsdorf Station is located directly above the turnaround area of the metro and next to the suburban railway line, special attention was paid to the design of the noise protection and the electromagnetic separation of the building – in order to ensure optimal interior comfort.
The design of the foundation was a particular challenge for the structural engineers due to the fact that all of its weight has to be carried away by the loadbearing structure of the metro tunnel. In addition to the need for vibration protection, this structure also reacts to the impact of the wind, tilting, and earthquakes. The use of the hybrid timber building method and lightweight elements proved to be ideal in this situation, due to their major contribution to the reduction of the weight of the building.

High-quality user experience
The step-backs at upper level react to the strict urban planning rules while enabling the building height to be optimized. Continuous strip windows and recesses in the facade ensure the optimal lighting of the usable spaces deep with the building. Attractive open spaces with numerous terraces and loggias add to the high-quality visitor experience.

atp grand central wien droneproject 9 (.jpg )

Dimensions size
Original 3307 x 2480 2.53 MB
Medium 1200 x 900 432.41 KB
Small 600 x 450 121.38 KB
Custom x

More Images

3.23 MB
2.05 MB
1.55 MB
27.11 KB